We designed and installed an energy-saving solar system for Grid Group, Durban!

Solar array Grid Group
Grid-Tied Solar System installed for Grid Group, Durban

Project Scope:

  • To meter and size a grid-tied solar system to subsidise the electricity usage from the municipality, ensuring optimised production (i.e: a system that produces the load required, not oversized)
  • Design a system that would not impact the aesthetics of the building
  • Deliver power according to the guaranteed solar system production
  • Deliver a 4-year or less payback through electricity savings (on a 20-25 year asset)
  • Mitigate financial risk

Success:

  • 260kWp grid-tied system was installed 
  • System will reduce the site's utility consumption by up to 35%
  • Seamless system, transition between utility power and solar power is barely noticeable
  • The Inverter App/Website allows for live system and per-panel performance monitoring
  • Solar panels have a liner output warranty for 25 years
  • Inverters come with a 20 year warranty
  • Monthly reporting with quarterly site inspections and panel cleaning ensures the investment is bringing in the anticipated financial returns

Click here to watch a quick video on this project!

Download your copy of our Case Studies to view our impressive portfolio of energy-saving projects.

Click here to download now!

 

Thinking about installing a solar solution at your facility? Speak to our experts, we're here to help you!

Inquire now. 

Feel free to share this article
Published - 19/08/2020